Full kitchen renovation for a detached home in South London.
We stripped the original kitchen out & pulled down the ceiling. We installed a new ceiling with coving and inset lighting.
New doors were painted and hung and floors tiled. Walls were sanded back and then painted. We then installed new cabinets & appliances and decorated the remaining space.
Time to complete: 4 weeks
